Salida Hulling Solar

  • Project Location: Modesto, CA
  • Project Completion: 2011
  • Solutions: 8” I Beam Piles (128 Qty.)
  • Markets: Energy
  • Techniques: Vibratory

  • Foundation installed and tested 128 8” @ 15’ long I Beam piles for a solar farm in Modesto, CA. Using a vibratory method, Foundation successfully drove each pile 11’ below grade.