Salida Hulling Solar
- Project Location: Modesto, CA
- Project Completion: 2011
- Solutions: 8” I Beam Piles (128 Qty.)
- Markets: Energy
- Techniques: Vibratory
Foundation installed and tested 128 8” @ 15’ long I Beam piles for a solar farm in Modesto, CA. Using a vibratory method, Foundation successfully drove each pile 11’ below grade.