PG&E Ravenswood 0/1A

  • Project Location: Palo Alto, CA
  • Project Completion: 2010
  • Solutions: 14” PCPS Piles (4 Qty.)
  • Markets: Utility
  • Techniques: Driven & Concrete forming

  • Foundation was awarded the contract to install 4 PCPS Piles at 55’ long to support utility poles. Foundation was also contracted to install cap connections, form and pour the footings.