PG&E Mendota Substation
- Project Location: Mendota, CA
- Project Completion: 2011
- Solutions: 12/18” Tubex Grout Injection (28 Qty.)
- Markets: Utility
- Techniques: Drilled
Foundation was awarded the contract to install 28 12/18” Tubex Grout Injection Piles. Due to existing power lines that would not be de-energized, Foundation completed the project using custom-built equipment specifically made for low-overhead applications.