PG&E Mendota Substation

  • Project Location: Mendota, CA
  • Project Completion: 2011
  • Solutions: 12/18” Tubex Grout Injection (28 Qty.)
  • Markets: Utility
  • Techniques: Drilled

  • Foundation was awarded the contract to install 28 12/18” Tubex Grout Injection Piles. Due to existing power lines that would not be de-energized, Foundation completed the project using custom-built equipment specifically made for low-overhead applications.