PG&E Gilroy

  • Project Location: Pittsburg, CA
  • Project Completion: 2021
  • Solutions: TSP Footing Work (5 Qty.), 20’ Tubex Piles (4 Qty.)
  • Markets: Utility
  • Techniques: Concrete Forming, Driven Pile

  • Foundation installed TSP Footing work at 5 Towers and replaced the failing Foundation for 1 Tower. While most of the project was footing replacement, Foundation utilized custom-built equipment to install 4 Tubex Piles that are 30’ long.