North Atwater Bridge

  • Project Location: Los Angeles, CA
  • Project Completion: 2019
  • Solutions: 48” Pipe Piles (32 Qty.)
  • Markets: Bridges
  • Techniques: Vibratory & Driven

  • Foundation was awarded the contract to install 32 48” Pipe Piles at two locations. Within the contract, Foundation also did PDA testing of the first pile at each of the two locations.