New Irvington Tunnel

  • Project Location: Alameda, CA
  • Project Completion: 2013
  • Solutions: 14” Precast Piles (72 Qty.)
  • Markets: Transportation
  • Techniques: Driven

  • Foundation was awarded the contract to install 72 14” precast piles, both vertical and battered (angled). One challenge that this project presented was accessibility to the job site. To meet those requirements, Foundation used our truck crane, which can unlock versatility for specific job locations.