Water Retention Basis

  • Project Location: Burlingame, CA
  • Project Completion: 2012
  • Solutions: 14” PCPS Piles (102 Qty.)
  • Markets: Utility
  • Techniques: Driven

  • Foundation was awarded the contract to install 102 14” PCPS piles. Given budgetary concerns and soil composition, Pre-Cast Pre-Stressed Piles were the chosen pile type.