Water Retention Basis
- Project Location: Burlingame, CA
- Project Completion: 2012
- Solutions: 14” PCPS Piles (102 Qty.)
- Markets: Utility
- Techniques: Driven
Foundation was awarded the contract to install 102 14” PCPS piles. Given budgetary concerns and soil composition, Pre-Cast Pre-Stressed Piles were the chosen pile type.

