Equinix

  • Project Location: San Jose, CA
  • Project Completion: 2020
  • Solutions: 16” Displacement Auger Cast Piles (378 Qty.)
  • Markets: Technology (Data Center)
  • Techniques: Drilled Shafts

  • Foundation installed 378 16” Displacement Auger Cast Piles at 60’ long. Included in the contract, tension and compression tests were conducted. Due to the project location, the piles were installed with existing structures.