Centinela Hospital

  • Project Location: Inglewood, CA
  • Project Completion: 2012
  • Solutions: 20/26” Tubex Grout Injection (77 Qty.)
  • Markets: Hospital
  • Techniques: Drilled

  • Foundation was contracted to install (both indicator and production) 77 total Tubex Grout Injection Piles. At 60’ long, the piles required splicing. The project was a part of a large seismic retrofit program.