Cedars Sinai

  • Project Location: Los Angeles, CA
  • Project Completion: 2011
  • Solutions: 12/18” Tubex Grout Injection Piles (6 Qty.)
  • Markets: Healthcare
  • Techniques: Drilled

  • Foundation was awarded the contract to engineer and install 6 Tubex grout injection piles. Static load tests were included in the contract to administer and confirm pile capacities. Foundation chose the Tubex piles, which can be installed in tight working spaces and yield extreme load-bearing capacities.