Camp Pendleton

  • Project Location: San Diego, CA
  • Project Completion: 2020
  • Solutions: 14” PCPS Piles (401 Qty.)
  • Markets: Military
  • Techniques: Driven

  • Foundation was awarded the contract to install 401 14” PCPS Concrete piles totaling 34,509 LF. Piles were installed in three locations with lengths varying from 80-90’.