Camp Pendleton
- Project Location: San Diego, CA
- Project Completion: 2020
- Solutions: 14” PCPS Piles (401 Qty.)
- Markets: Military
- Techniques: Driven
Foundation was awarded the contract to install 401 14” PCPS Concrete piles totaling 34,509 LF. Piles were installed in three locations with lengths varying from 80-90’.

