Cal Poly Pomona

  • Project Location: Pomona, CA
  • Project Completion: 2020
  • Solutions: 18” Displacement Auger Cast Piles (585 Qty.)
  • Markets: Education
  • Techniques: Drilled

  • Foundation was awarded the contract to design and install 585 18” (at 50’ in length) Displacement Auger Cast piles. Foundation not only designed the piles but also designed the layout and conducted appropriate testing (i.e. static tension tests) to confirm pile capacity.