Bir Substation

  • Project Location: Alameda, CA
  • Project Completion: 2010
  • Solutions: 14” PCPS & 18” Pipe Piles (60 Qty.)
  • Markets: Utility
  • Techniques: Driven

  • Foundation was awarded the project to install and splice (when needed) 60 total piles in Alameda, CA. Our Engineering team value-engineered a driven alternate (original plans and specs called for Drilled Auger Cast Piles), saving the owner money and time. Due to existing power lines that would not be de-energized, Foundation was able to meet deadlines using custom built equipment specifically made for low-overhead applications.