CISS Piles

For over five decades, since its inception in 1971, Foundation has solidified its position as a premier provider of driven pile solutions throughout the West Coast.  Specializing in complex deep foundation projects, our expertise extends to navigating diverse soil conditions, ensuring reliable and high-capacity pile driving for infrastructure and commercial developments.  Our proven track record in driven pile installation and commitment to innovative techniques make us the go-to choice for construction projects seeking robust and reliable foundation systems.

 

What Are Cast-in-Steel-Shell Piles?

CISS piles are structural steel hollow pipes that are driven or vibrated into the ground using an impact or vibratory hammer.  Once the pipe reaches the desired depth and/or resistance, the piles are drilled out (if required), a reinforcing cage is installed, and the pipe is filled with concrete, creating a high bearing capacity.

Advantages

Of Installing CISS Piles

Penetration of Difficult Soils: CISS piles can penetrate dense soil layers and obstructions as opposed to other pile types.  Relief drilling can be utilized to get through challenging soil strata.

Slicing Capability: Steel pipe sections are relatively easy to splice together to achieve greater lengths.

High Load Capacity: Large-diameter CISS piles typically offer high axial capacity due to their substantial surface area (enhancing skin friction) and large cross-sectional area (increasing end-bearing).

Large Sizes of Pipe: Benefit from a comprehensive range of steel pipe pile sizes to suit a multitude of construction applications.  Typical sizes range between 24″ – 96″.

Installation Techniques: The ability to install CISS piles using either impact or vibratory techniques enhances their adaptability, ensuring they can meet the diverse requirements of a wide range of projects.

Cast-in-Steel-Shell Pile Advantages:

  • Ability to Penetrate Dense Soils
  • Easy Splicing for Extended Length Steel Pipe Piles
  • High Axial Capacity for Heavy Loads
  • Large Steel Pipe Pile Sizes
  • Fast Installation
  • Versatile Installation Methods: Impact & Vibratory

Installation Methods

1

Step 1: Our team gives a thorough site assessment to determine pile size(s) and what methods will be utilized to install the pile.

2

Step 2: The pipe is fixed under the selected hammer and rig, and it begins to drive the pipe into the ground until it reaches the desired depth and/or resistance. In many situations, a vibratory hammer is used to drive the pile until resistance, and then the impact hammer can drive the pile further. This leads to faster production times.

3

Step 3: Once the pile reaches the required depth, a full-length rebar reinforcing cage is lowered into the pipe and is filled with concrete.

4

Step 5: Once given time to cure and set, the pile cap is poured, following the installation of the pile cap.

Cast-in-Steel-Shell Pile Applications


  • Structural improvement of existing foundation structures during expansion and/or renovation.

  • Transmission tower and other utility Infrastructure.

  • Seismic retrofitting

  • Residential and Industrial Applications (hospitals, parking garages, high-rise buildings, etc.)

  • Bridge foundations

Contact Us Today

Foundation’s proven expertise delivers dependable and efficient CISS pile solutions for your project’s foundation needs. Ensure a stable and long-lasting structure – Contact us today for a consultation and project-specific quote..