In Solano County, CA Foundation led the effort to design and install the deep foundation system for four 200-foot-tall electrical towers. Since the owner was unable to access the project location to perform a thorough geotechnical investigation, Pipe piles were chosen as the solution. Capacity requirements were met by conducting dynamic testing.
The Project
Based in a remote area along the Napa River, access to the project was extremely difficult. Foundation’s unique solution was to access the location via barge and helicopter to fly in materials/equipment. Due to the height of the towers, our team chose and designed a pile that could withstand the high lateral loads, Foundation was able to meet the project schedule utilizing a 100T crawler crane, driving thirty 16-inch and six 20-inch pipe piles all 100 feet in length.
Challenges
Completion of this time-sensitive and high-priority infrastructure project while minimizing environmental impact in a highly sensitive, ecological area.
- Access is the largest challenge for this project
- Certain areas with shallow water could not be dredged due to environmental permit limitations
- The marsh environment contained an unknown number of organics
The Solution
Foundation completed this project by leveraging experience, partnership with the owner, and mitigating risk appropriately.
- Due to the access challenge, Foundation used a barge and helicopter to fly in materials, equipment, and personnel
- Since the shallow water could not be dredged, Foundation designed and installed a trestle to access certain areas of the site, mitigating any environmental risks
- Given the marsh environment, Foundation, in partnership with Magnum Piering, designed a unique epoxy-coated pipe pile grillage.

