Our team provided foundation solutions for Southern California Edison's high-voltage electrical towers crossing the Cerritos Channel. This involved the installation of 96 precast concrete piles, each measuring 24 inches in diameter and ranging from 89 to 102 feet in length, at the Port of Long Beach.

Installation

  • Installation of Test Piles:

    • Driving of 16 precast concrete test piles (24″ octagonal) to depths of 102.5′ (12 piles) and 89.5′ (4 piles), totaling 1,588 linear feet.
    • PDA testing analysis on all 16 test piles, including restrike tests.
  • Installation of Production Piles:

    • Driving of 32 precast concrete production piles (24″ octagonal) to a depth of 89.5′, totaling 2,864 linear feet.
    • Driving of 64 precast concrete production piles (24″ octagonal) to a depth of 102.5′, totaling 6,560 linear feet.

Design Process and Selection

A comprehensive evaluation of foundation options, including driven pile and drilled shaft systems, led to the selection of a driven pile solution for Southern California Edison’s project. This decision was based on a rigorous cost-benefit analysis, considering factors such as installation speed, site security, and the critical location of the high-voltage towers. The rapid deployment and cost-effectiveness of driven pile technology aligned with the project’s specific constraints and overall objectives.


Mitigating Risk and Prioritizing Safety

Our team adhered to stringent safety protocols throughout the installation process to prevent contact with high-voltage powerlines and towers. Each pile was meticulously handled, lofted, and driven, ensuring the highest standards of safety and efficiency. Despite the demanding construction schedule and complex site logistics, our team successfully installed these massive piles with zero safety or quality incidents.